Concept imagery · geometry, finishes and feasibility remain provisional.
Production boundaries
Approve the explanation before we build the object.
- Production begins only after written proof approval; two revision rounds are included before approval.
- The starting scope excludes missing source-file reconstruction, site installation, extraordinary freight and unusually complex design work.
- Concept imagery explains an art direction only; final geometry, colours, labels and production feasibility remain subject to the approved source pack.
- Interactive logic is limited to the approved presentation sequence and does not connect to building, machinery or safety-control systems.
- Display indoors on a level, load-rated surface; large bases require two-person lifting and destination access checks.
- Small removable pieces are presentation components, not toys, and must be kept away from children without supervision.
- Use only the supplied low-voltage electrical adapter and controller; moving parts are presenter-operated, must remain guarded, and must be isolated before service.
