Concept imagery · geometry, finishes and feasibility remain provisional.
Production boundaries
Approve the explanation before we build the object.
- Production begins only after written proof approval; two revision rounds are included before approval.
- The starting scope excludes missing source-file reconstruction, site installation, extraordinary freight and unusually complex design work.
- Concept imagery explains an art direction only; final geometry, colours, labels and production feasibility remain subject to the approved source pack.
- Process geometry and timing are communication abstractions and do not replace engineering, operational or emergency information.
- Display indoors on a level, load-rated surface; large bases require two-person lifting and destination access checks.
- Small removable pieces are presentation components, not toys, and must be kept away from children without supervision.
- Low-voltage electrical elements and moving parts must be isolated before transport or service; only trained presenters may open guarded sections.
